Version 7.48.3631
Main Changes
Universal (UV)
- Added a new processing error type
IRRELEVANTfor events that cannot affect replanning. - Updated the accounting of soft windows during replanning.
- Replanning can now be started without existing trips - in this case, event processing and regular planning will be performed.
Studio (ST)
- Accelerated the processing of a click on the map.
- Tables with a scrollbar no longer shake when the screen is scaled.
- Scrollbars appear immediately when the data is loaded.
- Saved table settings no longer replace the filters and columns of the new version or break the application, and custom column names are visible immediately after loading.
- Fixed the delete button in the icon set editor.
Monitor (MT)
- Accelerated the operation of the map.
- Updated the event infobar.
- In the trip infobar, the 2GIS and Google Maps buttons of a transition open the route.
- Changing the table filter now updates the map layer.
- Fixed the expansion of panels, in which the infobar could go beyond the edge of the screen.
Specialist
- Added support for signing the ETRN when completing an order and for generating the
WAYBILL_SIGNEDevent. - Added a "Documents" section with the QR codes and ETRN waybills of the trip.
- Updated the completion screen for an order and a group of orders, added a notification.
- Added the display of the current ETRN status to the order card.
- A trip rejection made by another crew no longer hides the trip from the current crew.
- Events in the error state no longer change the displayed statuses of orders and trips in the application.
Update Information
The API version is backward compatible; libraries need to be updated.
The Java and Kotlin library versions have not been published for this version; they will be published with the next release.